Green Bay Packaging Drive Install
May 26, 2020
Novus International
June 11, 2020
Facility upgrade for new chemical process. Installation of conduit, wire, and electrical apparatus for hookup of valves, flow meters, temperature sensors, motors and other electrical devices. Installation of multiple control cabinets and PLC terminations. All work performed involved explosion-proof apparatus and devices and was scheduled over a six-month period.
Project Details
Client
Future Fuel
Location
Batesville, AR
Schedule
6 months