
Entergy Power Plants Maintenance and Repairs
June 11, 2020
Future Fuel Control Electrical Installation
May 26, 2020
Facility upgrade of control and power systems for paper mill equipment. Installation included thousands of feet of conduit, wiring, and electrical apparatus for hookup of drives, motors, conveyors, telemetry, and electrical devices. Installed additional drives for acid alkaline system. Install included conduit and wiring for lighting upgrade. Project installation was scheduled over a four-month period to accommodate facility operations.
Project Details
Client
Green Bay Packaging
Location
Morrilton, AR
Schedule
4 months